RESOURCES
Make the work package portable.
Download the authored model, procedures and review template. Check the source boundary before adapting anything to an actual site.

Three training procedures / ZIP
Nine files: HTML, TXT and JSON. 36 authored steps; revision A DRAFT.
Model and part manifest / JSON
Configuration, four geometry views, named parts and model hashes.
Original MP2 model / GLB
Intact fictional source scene, including human context geometry.
Evidence capture template / JSON
A blank structured example for training review.
Equipment concept map / SVG
Existing diagram; refer to the MP2 model for the current cam/keeper hierarchy.
SOURCE AND REVISION REGISTER
What the current package establishes.
- MP2 model
- Existing authored fictional prop; local kinematic contact/path illustration only. Website views remove studio/person context from display and add named materials for selection.
- Model constraints
- Guard hinge [-1.65, 0, 0.08]; opening −82° about Y. Two guard-mounted cams turn 90° about Z; keepers remain fixed. Coordinate units are not verified physical dimensions.
- Retention geometry
- Tongue front z 0.33 meets keeper rear z 0.33. The keeper support joins frame-front z 0.07 to the striker. No force, load or engineering-fit validation.
- Images
- Twelve earlier concept scenes plus one reviewed haul-truck commercial illustration. The truck scene supports a task story and is not a whole-object model-reference pack.
- Procedures
- Three new authored training concepts. No operational SOP, OEM instruction or release authority is supplied.
- Product access
- Routes discovered in the public EON Product Hub on 2026-10-29. Authentication and Mining workspaces are managed separately.
- Viewer
- Locally bundled model-viewer 4.4.0 with Apache 2.0 license. No account or API key is needed for this public model viewer.
QUALIFICATION GATES
The next source package to review.
- Permitted CAD or scaled, registered multi-view equipment images and a configuration owner.
- Verified retaining faces, clearances, motion stops and physical units.
- Approved SOP and explicit training adaptation permission.
- Named SME/assessor review and a separately authored Genesis lesson.
BEGIN WITH ONE TASK
Bring the equipment and the decision.
A permitted source image, a named procedure owner and one useful acceptance test make a practical starting point.